All construction and demolition contractors shall provide onsite refuse receptacles,
bulk containers, or detachable containers for loose debris, paper, waste building
materials, scrap building materials, and other trash produced by those working on
the site. All such materials shall be containerized by the end of each workday, and
the site shall be kept in a reasonably clean and litter-free condition. The number
and type of refuse receptacles, bulk containers, or detachable containers shall be
determined by the city, based on the size of the project. Dirt, mud, construction
materials, or other debris deposited upon any public or private property as a result
of construction or demolition activities shall be immediately removed by the contractor
and in all cases by the end of the workday.
(Code 1980, § 6-2-18)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');